Regional stations with overpasses (wooden station buildings, platforms, tracks, overpasses) (跨線橋のある地方駅(木造駅舎・ホーム・線路・跨線橋)) 跨線橋のある地方駅(木造駅舎・ホーム・線路・跨線橋)

Content ID:2318641

  • 29
  • 300 GOLD
  • 1,500 CLIPPY
This material can be used in Studio Mode. (What is Studio Mode?)

We created regional stations with traces of the Showa era from the station front to the tracks. It contains a wooden one-story station building (waiting room, ticket gate, office, toilet), two opposing platforms on two sides, railroad tracks, an old rail shed, an overpass, a station square, and two cherry blossoms. You can move all the doors and windows of the station building, the windows of the overpass, and the hands of the clock. Station names and line names are fictitious. Includes 15 camera angles. 昭和の面影が残る地方の駅を、駅前から線路まで一括で作りました。木造平屋の駅舎(待合室・出札口・事務室・便所)、向かい合う2面2線のホーム、線路、古レールの上屋、跨線橋、駅前広場、桜2本が入っています。駅舎の全部の戸と窓、跨線橋の窓、時計の針が動かせます。駅名・路線名は架空です。カメラアングル15件入り。

About this material

We built a small station in the countryside from the plaza in front of the station to the end of the railroad tracks. The inside of the station building (waiting room, ticket gate, office) is also included.

Placement

The south is in front of the station, and the station building is facing north, platform 1, tracks, and platform 2. The two platforms are connected by an overpass. There is a waiting area on the side of line 2.

Inside the station building

There are benches in the waiting room, a daruma stove, a ticket gate, a ticket gate, and a tatami room between the office and the inn.

Platforms, tracks, and overpasses

Moving parts

Four sliding doors and windows in front of the station building, an office door, a toilet door, a sliding door in the waiting area on Line 2, an overpass window, and the clock hands in the waiting room. There are a total of 83 locations. The window can be opened by pulling two shoji screens left and right.

15 camera angles

Station building seen from the front of the station / Driveway / Panoramic view (overhead view) / Platform 1 / Platform seen from the tracks / Station building from Line 2 / Overpass / Inside the overpass / Platform from the overpass / Ticket gate / Waiting room / Exit gate / Office / Toilet / Tree and station building. You can choose from tool property.

Change the seasons (3 types of materials)

You can choose the color of the two cherry blossoms in front of the station from three types: cherry blossoms, green trees, and autumn leaves. The shape of the tree is the same, only the color of the flowers and leaves changes. The scattered petals will also have the same color.

Select the 3D layer and switch it in the material settings of the sub tool detail "3D Object". The first is cherry.

Turn it off and use it

If you erase the roof of the station building, you can see the arrangement of the waiting room and office from above. Cherry blossoms have separate parts of the flower and the trunk.

LT Conversion

This is the main line converted to LT by CLIP STUDIO.

When there is a wide view

If you move the camera and the inside is chipped, set it to Near 5 and Far 100000. (Because clipping changes automatically in the distance)

Dimensions

  • Site: Approx. 90m × Approx. 54m
  • Station building: Frontage 14m × Depth 7m (one-story building)
  • Platform: Length 60m, Height 920mm (relative 2 sides 2 lines)
  • Origin: The ground of the station square, the tracks are in the X direction

この素材について

地方の小さな駅を、駅前の広場から線路の先まで一棟ぶん作りました。駅舎の中(待合室・出札口・事務室)も入っています。

配置

南が駅前、北に向かって駅舎、1番線ホーム、線路、2番線ホーム。2つのホームは跨線橋でつながります。2番線側には待合所があります。

駅舎の中

待合室のベンチとだるまストーブ、出札口、改札口、事務室と宿直の畳の間が入っています。

ホームと線路・跨線橋

動く部分

駅舎の正面の引戸4枚と窓、事務室の戸、便所の戸、2番線の待合所の引戸、跨線橋の窓、待合室の時計の針。合わせて83か所です。窓は2枚の障子を左右に引いて開けます。

カメラアングル15件入り

駅前から見た駅舎/車寄せ/全景(俯瞰)/1番線ホーム/線路から見たホーム/2番線から駅舎/跨線橋/跨線橋の中/跨線橋からホーム/改札口/待合室/出札口/事務室/便所/木と駅舎。ツールプロパティから選べます。

季節を変える(マテリアル3種)

駅前の桜2本の色を、桜/緑の木/紅葉の3種から選べます。木の形は同じで、花と葉の色だけが変わります。散った花びらも同じ色になります。

3Dレイヤーを選び、サブツール詳細の「3Dオブジェクト」のマテリアル設定で切り替えます。最初は桜です。

消して使う

駅舎の屋根を消すと、上から待合室と事務室の配置が見えます。 桜は花と幹が別の部品です。

LT変換

クリスタでLT変換した主線です。

広い景色のとき

カメラを動かして中が欠けるときは、ニア5・ファー100000に設定してください。(遠景ぶんクリッピングが自動で変わるため)

寸法

  • 敷地:約90m × 約54m
  • 駅舎:間口14m × 奥行7m(平屋)
  • ホーム:長さ60m、高さ920mm(相対式2面2線)
  • 原点:駅前広場の地面、線路は X 方向

Material マテリアル

  • Sakura 桜
  • Green Tree 緑の木
  • Autumn leaves 紅葉

Configuration 配置

  • default layout 初期レイアウト

Angle アングル

  • The station building seen from the front of the station 駅前から見た駅舎
  • Driveway 車寄せ
  • Panoramic view (overhead view) 全景(俯瞰)
  • Platform 1 1番線ホーム
  • Home seen from the railroad tracks 線路から見たホーム
  • Station building from Line 2 2番線から駅舎
  • Overpass 跨線橋
  • Inside the overpass 跨線橋の中
  • Overpass to Home 跨線橋からホーム
  • Ticket gates 改札口
  • Waiting room 待合室
  • Exit gate 出札口
  • Office 事務室
  • Toilet 便所
  • Trees and station buildings 木と駅舎

Content ID:2318641

Published : 3 days ago

Last updated : 3 days ago

Didymoi.A's profile Go to profile

興味をもっていただきありがとうございます! 私は漫画家をやっています。漫画で利用する素材などをBlenderを使って作成しています。たくさんアップしますのでフォローお願いします。Xでも制作過程を乗せていますのでフォローやいいねなど反応していただけると嬉しいです。また仲良くしていた方限定で制作要望を承る場合がありますのでダイレクトメッセージください。

Other materials by Didymoi.A

Popular “3D object” materials

New materials